HOW IS IT INSTALLED?

(Installing Vinyl Membrane over an existing flat roof)

Home

Are You Leaking?

Awards

Contact Us

Consulting

Completed Jobs

Better Roofs

Inspection & Repairs

Install Process

Project Highlights

Commercial

Residential

Single Ply

Ugly Roofs

What Sets Us Apart

IB Spec Writer Link

Info Sheets

During Install

IB Roof Systems Website Link

 

Step One

Prepare the surface, by cleaning up debris off the roof, removing unwanted stacks, curbs, and portions of the existing roof where needed.

 
 

Step Two

Cover existing system with a separation sheet, such as: Plastic, Fan Fold, Felt, or in lots of cases Insulation board to bring up the roofs R-Value. Roll out membrane and screw down to the deck.

 
 

Step Three

Upon laying out the materials and mechanically attaching them, the final step is welding the seams together. This actually melts the material causing the sheet to become one monolithic piece over the entire roof.

 

Fischer Companies, Inc.  l  Ellsworth, WI 54011  l  Office 1-715-273-5100  l  Fax 1-715-273-5220

Copyright 2009@ FCI